Finch · Q3 2026 edition
State of the Claim.
Finch is a claims intelligence platform that turns residential and commercial property claim data into leverage. Drawing on 11,530 property claim files handled by public adjusters, with data through October 16, 2026, its Q3 report sets out 20 findings on costs, coverage and settlements. Each finding states the sample it rests on.
The report by the numbers
Database: 11,530 claim files, data through October 16, 2026
- Lower pricing vs. repairs left out (46 claims)
- More than 5 to 1
- Insurer priced lower / higher / the same
- 236 / 77 / 35 repairs
Summary: most of the gap sat in the price of repairs already on the list, not in what was omitted.
- typical time from the loss to bringing in a public adjuster (8,803 claims)
- 10 days
- where finished disputed claims settled, relative to the insurer’s figure (61 claims)
- 1.41x
- median from intake to final insurer payment; half of claims finish sooner (5,050 claims)
- 321 days
Inside this report
A claim may begin with a damaged property, but it quickly becomes something more personal. A family needs to get home. A business owner needs to reopen.
Somewhere in a crowded file are the details that decide what happens next. This report looks across 11,530 property claim files from public adjusting firms, with data through October 16, 2026, for the patterns those details make, and the places where they are easiest to miss.
Findings come from public adjusters’ claim files and are not a representative national sample. Each finding states the sample it rests on. Claims opened through October 16, 2026; the database was queried on October 17 and 18, 2026.
01 · The estimate gap
The big gap: price.
On 46 disputed property claims where both the insurer and the public adjuster itemized the work, the insurer usually listed the same repairs and priced them lower.
More than 5 to 1
Dollars lost to lower pricing for every dollar lost to repairs left out
$7.2M lower pricing$1.3M omissions
On repairs both estimates listed, the insurer priced lower 236 times, higher 77 times and the same 35 times.
Where insurers price lower
Cabinetry: 55%
On a typical claim, the insurer’s cabinetry price was 45 cents for every adjuster dollar, and it was lower on 19 of 21 claims.
- Labor only83% (12)
- Interior lath & plaster60% (6)
- Demolition57% (20)
- Cabinetry55% (21)
- Plumbing42% (13)
- Painting23% (21)
- Drywall21% (20)
- Finish hardware−7% (8)
Typical (median) cut per claim, on trades the adjuster priced; a trade the insurer left out counts as a full cut. Finish hardware ran higher at the insurer. Claims in parentheses. Selected from the 17 trades, of 39 priced on 4 or more claims, that appear on at least 6 claims with no single claim supplying more than half the gap. Plumbing fell from 83% to 42% as its claims grew from 7 to 13.
How big the price gap usually is
1.20x
On a typical repair both estimates listed, the adjuster’s price was 1.20 times the insurer’s. Most gaps were modest; the money sat in a few very large ones.
- Lower quarter1.00x
- Typical1.20x
- Upper quarter2.16x
- Top tenth5.68x
Adjuster’s price ÷ insurer’s price. 348 repairs priced by both sides. On 112 of them (32%), the insurer’s price matched or beat the adjuster’s.
02 · Where coverage meets the loss
Where coverage meets the loss.
Building code coverage
33.0%
About one in three claims with a readable policy limit had coverage for upgrades required by current building codes. The typical cap was 10% of the building’s coverage limit.
This is from 1,384 of the 4,195 claims whose policy limits we could read. The records do not show how often insurers paid for those upgrades.
Exclusions
Wear and tear leads.
Most policies carried earth movement, war and nuclear hazard exclusions, but insurers rarely cited them. Wear and tear was different: insurers cited it on 36.7% of claims with a written coverage decision.
In policy
Cited
- Wear and tearIn policy 43%Cited 36.7%
- Earth movementIn policy 71.2%Cited 7.5%
- WarIn policy 69.8%Cited 0.2%
- Nuclear hazardIn policy 70.1%Cited 1.5%
“In policy” = share of 2,437 claims with policy text; “cited” = share of 1,098 claims with a written coverage decision.
03 · Settlement and timing
The first number is not the last.
Where disputed claims settled
1.41x
On 61 finished claims where a letter stated both sides’ figures, the claim typically settled at 1.41 times the insurer’s figure. The adjuster had typically asked for 1.6 times.
- 1.00xInsurer
- 1.41xSettled
- 1.60xAdjuster
Typical (median) values, each measured separately, so the bars do not show where a typical claim landed between the two figures. “Finished” means no further insurer payment for six months.
First valuation to final amount
1.37x
On 171 finished claims, the final amount was typically 37% above the insurer’s earliest recorded valuation. More than one claim in four ended below it; one in ten ended at more than twelve times. This differs from 1.41x above because it covers different claims and starts from the insurer’s earliest figure rather than the one stated beside the adjuster’s request.
- 10th0.54x
- 20th0.89x
- 30th1.01x
- 40th1.09x
- 50th · median1.37x
- 60th1.78x
- 70th2.43x
- 80th4.49x
- 90th12.32x
Final ÷ earliest insurer figure, from the lowest tenth of claims to the highest. Half landed below 1.37x. The thin line marks 1.00x, the insurer’s earliest valuation. The 90th bar is cut short to fit.
How long claims take
321 days
Half of claims took more than 321 days from intake to final insurer payment, across 5,050 claims that received payment. About 11% were still being paid when measured.
- Under $50K170d
- Book-wide321d
- Above $1M524d
Larger claims took much longer. An open claim may move into a higher dollar group as more money is paid.
04 · Inside the file
What the file holds.
How much is in a claim file
77 emails, 16 files
The typical claim involved about 77 emails across 17 threads, counting emails visible only in reply history. The busiest quarter involved more than 180 emails; the top 5%, more than 460. Of those, a typical 52 are linked to the claim on the platform (63 counting every message in those threads); the rest appear only as quoted history inside replies. Among claims with files on the platform, the typical one held 16 files; across all stored files, photos and PDFs make up nearly half each; the largest 5% held at least 198. When claims get big, important details can be easy to miss.
Emails
- Typical file77
- Largest 5%460+
Files
- Typical file16
- Largest 5%198+
Emails: 2,730 claims opened after their firm’s email first reached the platform, including emails seen only in reply history; copies of one email in several mailboxes count once. These are floors: only connected mailboxes are visible. Files: 5,178 claims with files on the platform.
Time and money recovered
7.5x
The longest-running quarter of claims had a typical payout 7.5 times that of the quickest quarter. The fastest quarter finished in about three months; the slowest took about two years. This does not mean waiting caused the extra money.
- Fastest$77K
- Second$166K
- Third$285K
- Slowest$572K
How many policy forms appear in these files
About 2,800
The records first appeared to hold 3,674 different policy forms. Once editions of the same form and spelling variants were grouped, about 2,800 distinct forms remained. Across 2,730 claims carrying a form number, one standard commercial form appeared under 52 different spellings.
- Raw count3,674
- Distinct2,805
65.5% of forms appear in just one claim. The 200 most common accounted for about half of all form mentions (52.9%).
05 · More from the record
Three more patterns in the record.
Fire made up most of the claims whose estimates could be compared. Belongings tended to lose more to depreciation than buildings. And some claims appeared to reach the building limit, depending on how repairs were measured.
Fire and estimate gaps
69%
Fire made up 26 of the 45 claims with detailed estimates from both sides. On those, the insurer’s estimate was typically 69% of the adjuster’s, a gap of $45,160, close to the $43,137 across all 45. Insurers came no further from the adjuster on fire than on other claims.
- All types63%
- Fire69%
Insurer’s estimate as a share of the adjuster’s. On 6 of the 45 claims, the insurer’s figure was higher than the adjuster’s.
Withheld for depreciation
15.8% vs. 10.7%
When values were reduced for age and wear, belongings lost a typical 15.8%, versus 10.7% for the building. A wider measure points the same way (19.3% on 623 claims for belongings vs 12.4% on 111 for the building). On claims stating both, belongings lost more on two claims in three (37 of 54).
- Belongings15.8%
- Building10.7%
Based on proofs of loss on 71 claims (belongings) and 404 claims (building). These figures do not compare insurers with public adjusters.
When a building limit may cap a claim
12.8%
Using the settled replacement value, the most complete measure, 12.8% of 897 claims appeared to reach the insurance limit for the building. Other ways of measuring gave lower results.
- Final value12.8%
- Contractor8.2%
- Bid total5.1%
Contractor: 122 claims. Bid total: 801 claims. The three percentages come from different groups of claims and cannot be combined. The records cannot tell whether each building had enough insurance to rebuild.
06 · Duration
Duration, duration, and more duration.
Duration by state
395 days
Georgia claims took a typical 395 days to resolve, the longest in the book, followed closely by Tennessee and Delaware. California was quickest at 186 days, with Massachusetts and Louisiana close behind.
Longest
- Georgia395d
- Tennessee387d
- Delaware382d
Shortest
- Louisiana226d
- Massachusetts188d
- California186d
New York and New Jersey are not shown, though they are considerably higher than Georgia: about half of New York’s claims and over a third of New Jersey’s are still being paid, many from a book added in September 2026, so their medians are not yet reliable.
Longest by cause of damage
378 days
Half of fire claims took longer than 378 days to final insurer payment, against 321 days book-wide. Collapse followed at 348 days.
- Fire378d
- Collapse348d
- Book-wide321d
Fire makes up nearly half of the claims measured (2,384 of 5,050). Collapse: 44 claims.
Shortest by cause of damage
143 days
Vehicle impact claims finished fastest: half took longer than 143 days. Flood took 233 days and water from outside 238 days.
- Book-wide321d
- Water from outside238d
- Flood233d
- Vehicle impact143d
Claims measured: flood 98; water from outside 701.
07 · Limits, pace, timing
How a claim moves.
Which limits are reached most
More than a quarter
Loss of use and other structures each reached their limit on more than a quarter of claims (27–28%). Measured on what insurers paid, counting each payment amount once.
- Loss of use28% (127)
- Other structures27% (122)
- Contents / personal property15% (293)
- Dwelling15% (600)
Replies are fast; many requests get none
1.2 hours
On claim email, a reply typically came in a little over an hour (1.2 hours, across about 184,000 replies). But roughly a third of the adjuster’s own requests never got one. The replies that came were quick; the gaps were in the requests that got none.
- Requests never answeredAbout 1 in 3
From firms with email on the platform.
When people bring in an adjuster
10 days
The typical policyholder brought in a public adjuster 10 days after the loss. 44.2% did so within a week; 4.5% waited more than a year.
- Within a week44.2%
- 1 wk to 1 mo24.6%
- 1 to 3 months15.7%
- 3 mo to 1 year11.0%
- Over a year4.5%
Covers 8,803 claims with both dates. Timing explained very little of the difference in claim size, and almost nothing about how long the claim then took.
What complexity conceals can cost millions.
Connect your inbox and bring the full record into every conversation with the carrier.
In your demo
- See Finch build a claim record from real correspondence
- Compare every estimate version line by line
- Ask a question and get an answer with citations